We continued to work with them for further six months. The major achievements were:
- We were able stabilized the COGS and we knew exactly the reasons for variance.
- We reduced the input cost by nearly 2% over a period six month.
- Reduced wastage by 0.6%
- The most important, the staff started looking at as someone who can identify the problem and correct it.